Place the first plank With all the tongue aspect dealing with the wall. Press the end seam of the second plank into your close seam of the first plank, and then lock them alongside one another by laying the plank down. Go on Doing the job remaining to suitable. SPC https://lorenzofulzn.fare-blog.com/31509017/getting-my-spc-vinyl-flooring-manufacturer-to-work