In the beginning, the Jai Hind metro station was planned to become elevated. Even so, the AAI objected which the elevated extend up to the airport may possibly pose a risk to plane, so the route was even more reworked and also the station was shifted underground, 150 m through https://railway-recruitment23444.dbblog.net/5388505/railway-recruitment-kolkata-rrb-group-d-32000-vacancy-pdf